SSSP guide: how to write a site-specific safety plan
A site-specific safety plan (SSSP) sets out how health and safety will be managed on one job: the hazards, the controls, emergency plans, training and who does what. The HSWA doesn't name the SSSP, but many main contractors and clients ask for one before work starts.
A site-specific safety plan (SSSP) is a written plan for one job that records how health and safety will be managed there. Site Safe describes it as the plan main contractors and subcontractors develop for a job's hazards, incidents, training and emergencies. It sits under the wider system covered in our guide to contractor and site safety management.
The law: The Health and Safety at Work Act 2015 (HSWA) doesn't name the SSSP. Site Safe's own guidance says so, and adds that many principals ask for one.
The duty behind it: Section 34 of the HSWA requires every person conducting a business or undertaking (PCBU) that shares a duty to consult, cooperate and coordinate with the others, so far as is reasonably practicable.
The contract: Whether you need an SSSP usually depends on your main contractor and your contract. Check the tender or onboarding pack.
Public clients: Some clients make it a condition. The Ministry of Education requires contractors on school property projects to have an SSSP that meets its minimum requirements.
Who writes the SSSP on a shared site?
The SSSP is usually written by the company running the job and by each subcontractor working under it. WorkSafe's contracting guidance expects the lead contractor to work with subcontractors to create a health and safety plan. Site Safe's forms reflect this, with separate packs depending on where your company sits in the contracting chain.
Main contractor: Writes the overall project plan, sets site rules and coordinates the other PCBUs on site.
Subcontractors working for the main contractor: Complete an agreement and their own registers, so the main contractor can see how their work will be managed.
Companies working alongside the main contractor: Agree how their work fits with the main contractor's plan.
WorkSafe is clear that you can't contract out of health and safety duties. Writing a sound SSSP doesn't move your duty to someone else, and a company at the top of a contracting chain shouldn't push risk down it.
What should an SSSP include? (template)
An SSSP should include enough site-specific detail that a new worker could read it and know the hazards, the controls, who to report to and what to do in an emergency. Site Safe's SSSP forms give a practical structure. Use the headings below as your template and fill each one for this site only.
Job details: Site address, client, main contractor, start and finish dates and key contacts.
Roles and responsibilities: Who manages health and safety on site and how PCBUs will consult, cooperate and coordinate.
Hazard and risk register: Site hazards, their risk and the controls for each.
Hazardous substances register: What is on site, where it is stored and the safety data sheets.
Training and competency register: Who is on site and the tickets, licences and inductions they hold.
Site inspections: What gets checked, how often and by whom.
Toolbox talks: How and when the team will meet and how attendance is recorded.
Emergency response plan: Assembly points, first aid, rescue plans and emergency contacts.
Incident and injury reporting: How incidents and near misses are reported, investigated and recorded.
Task analysis: Job safety analyses (JSAs) for higher-risk tasks.
Build the hazard register once
Most of an SSSP's weight sits in the hazard register. Build it once for the site, then reuse it for inductions, toolbox talks and each subcontractor's agreement rather than retyping it into several documents. When a hazard changes, you then update one register, and every document that relies on it stays current.
How do you keep an SSSP current once work starts?
An SSSP is only useful if the team on the ground follows it and it changes when the site changes. A plan written in week one and filed in the site office won't reflect week six, when the scaffold is up, new trades have arrived and the hazards are different. Treat it as a working document.
Induct against it: Every worker, subcontractor and visitor is inducted on the site's hazards and rules before starting.
Talk about it: Use toolbox talks to brief the team when the plan changes.
Inspect against it: Site inspections should check the controls in the plan are in place.
Update it: Review the plan when the scope, the trades or the hazards change, and record the change.
Keep the records: Signed inductions, toolbox talk notes and inspection records show the plan was used, not just written.
The same approach works off building sites too: a maintenance contractor at a factory shutdown, an orchard development or a civil job with traffic management all benefit from a plan built for that site.
What goes wrong with SSSPs?
The most common SSSP problem is a generic plan with the site name changed. Assessors and main contractors can usually tell, and it does little for the people doing the work. Prequalification schemes such as SiteWise and Tōtika look for evidence that your system works on real jobs, so a good SSSP pays off twice.
Copy and paste: Hazards listed for a job you aren't doing, and real hazards missing.
Unsigned agreements: Subcontractors who never saw or agreed to the plan.
No emergency detail: An emergency plan without this site's address, access or assembly point.
Out of date: No record of changes as the job moved on.
Lost paperwork: Inductions and toolbox talk sheets that can't be found when a client asks.
How Site App Pro helps with SSSPs
Site App Pro gives you one place to record the hazards, inductions and checks that sit behind your SSSP, so you aren't chasing signatures across paper forms.
Digital hazard board: Keep the site's hazard register current and have the team acknowledge it when they arrive or when a hazard changes.
QR sign-in and inductions: Contractors and visitors sign in and complete the site induction in their mobile browser, with no app to download.
Forms and records: Run toolbox talks, JSAs and site inspections as digital forms and find them in one searchable place.
If your SSSP covers high-risk work, several trades or a demanding client, an experienced consultant can review it before you submit. Find a health and safety consultant who knows your industry.
Try Site App Pro for free
Start a 14-day free trial with no credit card required. Our team sets you up and uploads your existing forms for free, including the registers behind your SSSP. Pricing is flat-rate and user-based, and our NZ-based support team is here when you need help. Start your free trial.
SSSP guide: how to write a site-specific safety plan
A site-specific safety plan (SSSP) sets out how health and safety will be managed on one job: the hazards, the controls, emergency plans, training and who does what. The HSWA doesn't name the SSSP, but many main contractors and clients ask for one before work starts.
Ryan Hartley
CEO
Disclaimer: Site App Pro does not provide health and safety or compliance advice. This guide has been provided for information purposes only. You should consult your own professional health and safety advisors for advice directly relating to your company or before taking action in relation to any of the content provided.
Sole traders may need an SSSP when a main contractor or client asks for one. The HSWA doesn't name the SSSP, so the requirement usually comes from the contract. A sole trader is still a PCBU with duties under the HSWA, and a short plan for the job helps show how those duties are managed.
An SSSP should be as long as the job's risks need and no longer. A small, low-risk job may need a few pages, while a large site with several trades and high-risk work needs more detail. Focus on site-specific hazards, controls and emergency plans rather than general policy text.
An SSSP covers how health and safety is managed across a whole site or job. A job safety analysis (JSA) breaks one task into steps and records the hazards and controls for each step. JSAs for higher-risk tasks are often attached to the SSSP or completed on site as the work starts.
An SSSP can be digital if it meets your main contractor's or client's requirements. Digital forms and registers can make it easier to keep the plan current, collect signatures from subcontractors and find records later. Check whether your main contractor expects a specific format or set of forms before you start.
Health and safety management software for small to enterprise New Zealand companies.